Call us at 0086 18038746275

Our Product Detail

Welcome to our website!

_
_
_
_

stainless steel handrail hollow decoration ball

Model Number: BL-06 
Material: Stainless Steel manufacturing technique: stamping 
Surface finishing: satin or polish 
size: 38.4/42.4/50.8 mm 
Position: Handrails, Deck Railings / Handrails, Stair Railings / Handrails Payment 
Terms: TT 30% deposit, Balance before shipment 
QC pass: 100% inspection before delivery

Products Details

This is the description of stainless steel handrail hollow decoration ball

 

BL-06 Item NO.   
BL-06-508 50.8


Material of  stainless steel pipe fitting/stainless steel  handrail connector 304 (AISI304<V2A>) and 316(AISI316<V4A>) or zinc alloy
  

 

 Surface  satin finish or polished finish
 Suitable tube size

 0/38.1/42.5/48.3/50.8/63.5 mm

 package   plastic bag+cartons or as per customers' request
 MOQ   100 pcs
 Certificate   ISO9001
 Sample Lead Time   3-15days
 Delivery Time   25-40 days after sample confirmed and deposit received
 Payment Terms   30% deposit,and the balance before shipping
T/T,L/C,Western Union
 Delivery Method   by sea,by air or by express
 OEM   ACCEPTED

The determination of chromium in the stainless steel ball: there is only one element to determine the stainless steel ball. This is chromium, and each stainless steel ball has a certain amount of chromium.
So far, there is no stainless steel ball without chromium.
Main element chromium is decided to the performance of stainless steel ball, the fundamental reason is that after adding chromium alloy elements into the steel ball, pushing its internal contradiction movement to the aspects of development in the resistance to corrosion damage.
Second, the duality of carbon in the stainless steel ball: carbon is one of the main elements industrial steel ball, steel ball and organization to a large extent depends on the performance of the form of carbon content in steel and its distribution, especially the influence of the carbon in the stainless steel ball.

Carbon in the stainless steel ball stainless steel handrail hollow decoration ball on the influence of the organization is mainly manifested in two aspects, on the one hand, carbon austenitic elements are stable, and the role of a large (about 30 times of nickel), on the other hand due to the affinity of carbon and chromium is very large, complex carbide form - with chromium series.
Therefore, the effect of carbon on stainless steel ball is contradictory in terms of strength and corrosion resistance.
Knowing the law of this effect, we can start from different use requirements and choose stainless steel balls with different carbon content.

Production Machinery:

Machine Name Brand & Model No. Quantity Number of Year(s) Used Condition
Polishing Machine No Information 32 4.0 Acceptable
Hydraulic Press 10T 3 4.0 Acceptable
Punching Machine No Information 1 6.0 Acceptable
Sawing Machine SHENDIAO & GZ4232 1 1.5 Acceptable
Manual Lathe Cd6132 1 6.0 Acceptable
CNC Lathe E-CA6140, 6140A1750 3 6.0 Acceptable
Milling Machine X3112 1 6.0 Acceptable
Drilling Machine SWJ-16, S4020, SWJ-14 6 6.0 Acceptable

Q1.Where is your factory?       

We have two factories. One is for handrail fittings in Foshan City,another is for ss pipes in Chaozhou City.

 

Q2.What material do you have?       

SS304/SS201/SS316

 

Q3.Can you provide sample for us?        

Yes, free sample is available

 

Q4. How do you ensure quality control? 

we ensure the quality control by 2 steps: 1)after finish, our workers will check it one by one. 2)our package department will check before they pack.

  

Q5.How do you ship the goods to us?

We have the forwarder cooperated with us for 2 years, they can deliver the goods to you in very short time with competitive price,and you can ship by your own agent as your convinence.

 

Q6.Which country is your main market now?

Mid-East, North Africa, West Africa, South-east Asia, South America and Northern Europe district. Especially, a firm customer base in Saudi, Morocco, Nigeria, India, Bangladesh, and Russia etc.

 

Q7. Can you do the full set of handrails for us?
yes we can, our engineer will check your project drawings to make sure its accuracy for each different fittings and quantity.

 

Q8. How about your delivery time ? glass clamp glass clamp glass clamp glass clamp glass clamp 
15-20 days for Pipe. 25-30 days for handrail fittings .

 

Q9.how about your payment terms?

 T/T,L/C,D/P. 

 

We have a wealth of business experience. We provide satisfactory products and services to our customers around the world. Our products include stainless steel handrail hollow decoration ball,Ball,Ball Please contact us。

LEAVE A MESSAGE