Call us at 0086 18038746275

Our Product Detail

Welcome to our website!

_
_
_
_

stainless steel railing glass clip

Model: GC-03.
Material: 304/316 stainless steel.
Surface treatment: Satin or Mirror Finish

Products Details

This is the description of stainless steel railing glass clip 

 

GC-03 GC-03.jpg  Item NO. L QQ20141022165836.jpg  
GC-03-454527-0(flat) 45 0
GC-03-454527-381 45 38.1
GC-03-454527-424 45 42.4
GC-03-454527-483 45 48.3
GC-03-454527-508 45 50.8
GC-03-454527-635 45 63.5

 

 

 

Detail specification

Material of  stainless steel pipe fitting/stainless steel  handrail connector 304 (AISI304<V2A>) and 316(AISI316<V4A>) or zinc alloy
  

 

 Surface  satin finish or polished finish
 Suitable tube size

 0/38.1/42.5/48.3/50.8/63.5 mm

 package   plastic bag+cartons or as per customers' request
 MOQ   100 pcs
 Certificate   ISO9001
 Sample Lead Time   3-15days
 Delivery Time   25-40 days after sample confirmed and deposit received
 Payment Terms   30% deposit,and the balance before shipping
T/T,L/C,Western Union
 Delivery Method   by sea,by air or by express
 OEM   ACCEPTED

 Specializing in the stainless steel railing glass clip production of all kinds of furniture accessories and decorative accessories. With more than 20 years of production experience, advanced equipment and strong technical force, from material to finished products into the factory are ying of one-stop production. Including alloy die-casting workshop, plastic injection molding workshop and stamping workshop and electroplating workshop. In the whole process of production, ying da factory with high quality materials, advanced technology and the essence of management as the foundation, to produce high quality products, and adopted the ISO9001:2000 quality management certification, with independent import and export right, provides customers with a perfect, stable marketing services network, provide consumers with the best quality glass clamp hardware products.

 __.jpg

 

 .jpg

 

 

  .jpg

 .jpg

 

.jpg 

 .jpg

The stainless steel railing glass clip products are manufactured by advanced pressure casting technology, and have the excellent corrosion resistance of 304# stainless steel, which can maintain the long-term stable quality.
The surface can be sanded and polished.
Glass clamp product maintenance.
1. When cleaning, try not to wet the surface of the product, first use soft cloth or dry cotton sand dust, and finally wipe with dry cloth or water, and keep it dry.
Do not use a color cleaner, or use force to destroy the surface.
2. Prevent the contamination of acid and alkali salts.

Production Machinery:

Machine Name Brand & Model No. Quantity Number of Year(s) Used Condition
Polishing Machine No Information 32 4.0 Acceptable
Hydraulic Press 10T 3 4.0 Acceptable
Punching Machine No Information 1 6.0 Acceptable
Sawing Machine SHENDIAO & GZ4232 1 1.5 Acceptable
Manual Lathe Cd6132 1 6.0 Acceptable
CNC Lathe E-CA6140, 6140A1750 3 6.0 Acceptable
Milling Machine X3112 1 6.0 Acceptable
Drilling Machine SWJ-16, S4020, SWJ-14 6 6.0 Acceptable

 

 

.jpg 

 

05.jpg

 

Q1.Where is your factory?          stainless steel glass

We have two factories. One is for handrail fittings in Foshan City,another is for ss pipes in Chaozhou City.

 

Q2.What material do you have?       stainless steel glass

SS304/SS201/SS316

 

Q3.Can you provide sample for us?        stainless steel glass

Yes, free sample is available

 

Q4. How do you ensure quality control? 

we ensure the quality control by 2 steps: 1)after finish, our workers will check it one by one. 2)our package department will check before they pack.

  

Q5.How do you ship the goods to us?

We have the forwarder cooperated with us for 2 years, they can deliver the goods to you in very short time with competitive price,and you can ship by your own agent as your convinence.

 

Q6.Which country is your main market now?

Mid-East, North Africa, West Africa, South-east Asia, South America and Northern Europe district. Especially, a firm customer base in Saudi, Morocco, Nigeria, India, Bangladesh, and Russia etc.

 

Q7. Can you do the full set of handrails for us?
yes we can, our engineer will check your project drawings to make sure its accuracy for each different fittings and quantity.

 

Q8. How about your delivery time ? glass clamp glass clamp glass clamp glass clamp glass clamp 
15-20 days for Pipe. 25-30 days for handrail fittings .

 

Q9.how about your payment terms?

 T/T,L/C,D/P. 

LEAVE A MESSAGE