Call us at 0086 18038746275

Our Product Detail

Welcome to our website!

_
_

stainless steel handrail floor flange

Model Number: FR-04 
Material: Stainless Steel 
Mounted: Flooring 
Position: Bridge Railings / Handrails, Deck Railings / Handrails, Stair Railings / Handrails 
Metal: Stainless Steel304/316L 
Finish: Satin / mirror / plating 
For tube: 38.1/42.4/48.3/50.8 mm 
Technic of post flange: Casting/punching

Products Details

This is the description of stainless steel handrail floor flange
stainless steel flange
 
FR-04a
stainless steel handrail floor flange

size

FR-01   Item NO. Φ
FR-01-254 25.4
FR-01-381 38.1
FR-01-424 42.4
FR-01-483 48.3
FR-01-508 50.8
FR-01-635 63.5
FR-01-762 76.2

Material of  stainless steel pipe fitting/stainless steel  handrail connector 304 (AISI304<V2A>) and 316(AISI316<V4A>) or zinc alloy
  

 

 Surface  satin finish or polished finish
 Suitable tube size

 0/38.1/42.5/48.3/50.8/63.5 mm

 package   plastic bag+cartons or as per customers' request
 MOQ   100 pcs
 Certificate   ISO9001
 Sample Lead Time   3-15days
 Delivery Time   25-40 days after sample confirmed and deposit received
 Payment Terms   30% deposit,and the balance before shipping
T/T,L/C,Western Union
 Delivery Method   by sea,by air or by express
 OEM   ACCEPTED

Flange connection process is as follows:

Third, connection flange.
1. Check whether the specifications of flange, bolts and gaskets meet the requirements.
2. The sealing surface should be kept smooth and tidy without burrs.
3. Screw threads should be complete, not defective, and chimeric should be natural.
4. The gasket should be flexible and not easily aged, and the surface is not damaged, fold, scratch and other defects.
5. Before mounting the flange, clean the flange, remove dirt, dust, rust and other sundries, and clean the sealing line.

stainless steel flange

stainless steel flange

stainless steel flange

stainless steel flange

stainless steel flange

stainless steel flange

Fourth, mounting stainless steel handrail floor flange.
1. Flange sealing surface is perpendicular to the center of the pipe.
2. The same specification bolts shall be installed in the same direction.
3. The mounting position of the flange mounted on the branch pipe should be over 100 mm from the outer wall of the riser, and the distance from the wall of the building should be 200 mm and above.
4. Don't bury the flanges directly under the ground. It is easy to be corroded. If it must be buried in the ground, it should be treated with anti-corrosion.

Production Machinery:

Machine Name Brand & Model No. Quantity Number of Year(s) Used Condition
Polishing Machine No Information 32 4.0 Acceptable
Hydraulic Press 10T 3 4.0 Acceptable
Punching Machine No Information 1 6.0 Acceptable
Sawing Machine SHENDIAO & GZ4232 1 1.5 Acceptable
Manual Lathe Cd6132 1 6.0 Acceptable
CNC Lathe E-CA6140, 6140A1750 3 6.0 Acceptable
Milling Machine X3112 1 6.0 Acceptable
Drilling Machine SWJ-16, S4020, SWJ-14 6 6.0 Acceptable

stainless steel flange

stainless steel flange

Q1.Where is your factory?       

We have two factories. One is for handrail fittings in Foshan City,another is for ss pipes in Chaozhou City.

 

Q2.What material do you have?       

SS304/SS201/SS316

 

Q3.Can you provide sample for us?        

Yes, free sample is available

 

Q4. How do you ensure quality control? 

we ensure the quality control by 2 steps: 1)after finish, our workers will check it one by one. 2)our package department will check before they pack.

  

Q5.How do you ship the goods to us?

We have the forwarder cooperated with us for 2 years, they can deliver the goods to you in very short time with competitive price,and you can ship by your own agent as your convinence.

 

Q6.Which country is your main market now?

Mid-East, North Africa, West Africa, South-east Asia, South America and Northern Europe district. Especially, a firm customer base in Saudi, Morocco, Nigeria, India, Bangladesh, and Russia etc.

 

Q7. Can you do the full set of handrails for us?
yes we can, our engineer will check your project drawings to make sure its accuracy for each different fittings and quantity.

 

Q8. How about your delivery time ? glass clamp glass clamp glass clamp glass clamp glass clamp 
15-20 days for Pipe. 25-30 days for handrail fittings .

 

Q9.how about your payment terms?

 T/T,L/C,D/P. 

 

What is the guarantee of purchasing your products?
Hello, our company will arrange the professional quality personnel to carry out the packaging before delivery, so as to ensure that the products in your company are intact.

 

Could you please tell me that the goods are urgent, but the finance is not in the company?
Hello, I'm sorry that we can't deliver the goods from the system without receiving the payment. We need to pay the financial order to inform us of the order.

 

We are excellent Chinese manufacturers. Our products, such as stainless steel handrail floor flange,FLANGE,FLANGE, are of excellent quality and affordable. Looking forward to your inquiry。

LEAVE A MESSAGE