Call us at 0086 18038746275

Our Product Detail

Welcome to our website!

_
_
_
_

handrail base plate cover

Product name :FR-01
Surface treatment : Satin or Mirror Finish.
Meterial :  Stainless Steel 201/304/316.
Sample : Free of charge

Products Details

This is the description of handrail base plate cover
 

 

FR-01 FR-01..jpg  Item NO. QQ20141022110959.jpg  
FR-01-254 25.4
FR-01-381 38.1
FR-01-424 42.4
FR-01-483 48.3
FR-01-508 50.8
FR-01-635 63.5
FR-01-762 76.2
 
Detail specification

Material of  stainless steel pipe fitting/stainless steel  handrail connector 304 (AISI304<V2A>) and 316(AISI316<V4A>) or zinc alloy
  

 

 Surface  satin finish or polished finish
 Suitable tube size

 0/38.1/42.5/48.3/50.8/63.5 mm

 package   plastic bag+cartons or as per customers' request
 MOQ   100 pcs
 Certificate   ISO9001
 Sample Lead Time   3-15days
 Delivery Time   25-40 days after sample confirmed and deposit received
 Payment Terms   30% deposit,and the balance before shipping
T/T,L/C,Western Union
 Delivery Method   by sea,by air or by express
 OEM   ACCEPTED

 Flange connection process is as follows:
First, flange and pipe connection should meet the following requirements:
1. The center of the pipe and flange shall be on the same horizontal line.
2. The sealing surface of the pipe center and flange is 90 degree vertical.
3. The position of the flange bolt on the pipe should be consistent.

Second, gasket flange gasket is required as follows:
1. In the same pipe, the gasket of the same pressure of the same pressure should be the same, so that it is convenient to exchange with each other later.
2. For pipes that use rubber sheets, gaskets are preferred for rubber, such as water pipes.
3. The selection principle of the gasket is: as close as possible to the small width selection, this is the principle that should be followed in determining that the gasket will not be crushed.

 __.jpg

 

 

 

 

  .jpg

 .jpg

 

.jpg 

 .jpg

Production Machinery:

Machine Name Brand & Model No. Quantity Number of Year(s) Used Condition
Polishing Machine No Information 32 4.0 Acceptable
Hydraulic Press 10T 3 4.0 Acceptable
Punching Machine No Information 1 6.0 Acceptable
Sawing Machine SHENDIAO & GZ4232 1 1.5 Acceptable
Manual Lathe Cd6132 1 6.0 Acceptable
CNC Lathe E-CA6140, 6140A1750 3 6.0 Acceptable
Milling Machine X3112 1 6.0 Acceptable
Drilling Machine SWJ-16, S4020, SWJ-14 6 6.0 Acceptable

 

Broad Ocean Hardware Professional production guardrail complete set of accessories, including armrest support, handrail fittings, elbow elbow, decorative cover, glass clip, etc.
The material is mainly 304 and 316.
A large number of supply rails hardware fittings regular standard parts, can be customized according to the customers to customize production.
Welcome business buyers, construction contractors to negotiate cooperation.

.jpg 

 

05.jpg

 

Q1.Where is your factory?       

We have two factories. One is for handrail fittings in Foshan City,another is for ss pipes in Chaozhou City.

 

Q2.What material do you have?       

SS304/SS201/SS316

 

Q3.Can you provide sample for us?        

Yes, free sample is available

 

Q4. How do you ensure quality control? 

we ensure the quality control by 2 steps: 1)after finish, our workers will check it one by one. 2)our package department will check before they pack.

  

Q5.How do you ship the goods to us?

We have the forwarder cooperated with us for 2 years, they can deliver the goods to you in very short time with competitive price,and you can ship by your own agent as your convinence.

 

Q6.Which country is your main market now?

Mid-East, North Africa, West Africa, South-east Asia, South America and Northern Europe district. Especially, a firm customer base in Saudi, Morocco, Nigeria, India, Bangladesh, and Russia etc.

 

Q7. Can you do the full set of handrails for us?
yes we can, our engineer will check your project drawings to make sure its accuracy for each different fittings and quantity.

 

Q8. How about your delivery time ? glass clamp glass clamp glass clamp glass clamp glass clamp 
15-20 days for Pipe. 25-30 days for handrail fittings .

 

Q9.how about your payment terms?

 T/T,L/C,D/P. 

 

Could you please provide the electronic catalogue or the 3d drawing of the product?
Hello, our company is trying to perfect the 3D drawing file, and can be downloaded from the company's official website. Now please find the responsible salesman.

 

Could you please tell me the LOGO of your standard parts?
Hello, if you need to add the LOGO, you have to pay for the mold fee, and the order quantity is also available.
According to the different products, the mold fee and the order quantity will be determined by our company's engineering and procurement.

 

We have a wealth of business experience. We provide satisfactory products and services to our customers around the world. Our products include handrail base plate cover,FLANGE,FLANGE Please contact us。

LEAVE A MESSAGE